TL;DR
This guide compares the best project management software for agencies, built to help marketing agencies and creative teams manage projects, track progress, and improve client collaboration. Key features to evaluate include automation for repetitive tasks, customizable workflows that match agency operations, and time tracking for billable hours and profitability reports. The right project management tool depends on team size, whether you need advanced reporting for capacity planning, and how you balance client projects across different teams.
Why project management software for agencies matters when your team is already overworked
According to Function Point, 32% of agencies say their teams are somewhat overworked, and another 13% say they are frequently overworked. That is not a minor workload issue. It is a signal that delivery systems are breaking under volume and speed.
When teams run hot for months, the usual fixes stop working. More status meetings do not reduce rework. More tools do not help if they are disconnected. And long feedback loops with unclear ownership keep work moving, but not forward.
This is where project management software for agencies starts to matter. The right setup gives you one place to plan work, assign owners, track changes, and keep client feedback tied to the right version.
Let’s look at the 24 best project management software for agencies and their specifics so you can make the right decision when choosing your next solution.
1. Asana – best project collaboration tool

Asana is a workflow management software that helps you and your team to organize, plan, and track your work. It makes it simple to plan workflows and projects, see how your project is progressing, and keep your team on schedule at every step.
Through Asana’s colorful and visual design, all team members can see exactly what each person is tasked with, when those tasks are due, what the big goals are, and a well-defined path for achieving those goals.
Pros
- Timeline view to manage dependency
- Fast and flexible
- Easy to use
- User-friendly design
Cons
- Not suitable for video and other large files
Key features
- Task management and tracking
- Different boards for different projects
- Business process automation
Pricing
Asana offers four pricing plans to suit different business needs. The Personal plan is free forever for one or two people managing personal projects. Growing teams can upgrade to the Starter plan (from $10.99 per user/month billed annually), while larger companies can choose the Advanced plan (from $24.99 per user/month billed annually). For organizations that need more control and automation, Enterprise pricing is available upon request.
2. Trello – best for task management

Trello is a popular collaboration tool that allows individuals and teams to organize their tasks, projects, and to-do lists in a visual and intuitive way.
You can create boards representing projects or goals and populate them with lists and cards that can be moved around as tasks are completed, or priorities change.
Pros
- Its visual system makes it easy to organize tasks and projects clearly and intuitively
- Trello allows teams to collaborate in real time to stay up-to-date on project progress
- It’s highly customizable, allowing users to tailor it to their specific needs and workflows
Cons
- Its simplicity means it may lack advanced features
- It doesn’t have a built-in time-tracking feature
- Some users are hesitant to use Trello due to privacy and security concerns about their data
Key features
- Create multiple boards to organize your projects and tasks visually
- Each board can have multiple lists representing different stages or categories of tasks
- Create cards for individual tasks and move them between lists as they change status
- It allows users to assign labels to cards, making it easy to categorize and prioritize tasks
Pricing
Trello offers four pricing plans to fit different teams and budgets. The Free plan is $0 for up to 10 collaborators per workspace. The Standard plan starts at $5 per user/month when billed annually ($6 billed monthly). The Premium plan starts at $10 per user/month, billed annually ($12.50 billed monthly). And for larger organizations, the Enterprise plan starts at $17.50 per user/month billed annually (around $210 per user per year), with additional security and admin controls.
3. Filestage – best review and approval software

Filestage is a unique workflow management platform that allows team members to collaborate on digital content. It streamlines and automates your project review and approval processes while ensuring secure file sharing that complies with some of the top regulatory laws.
No installation is necessary, and your stakeholders can review and approve without an account. Designed with creative teams in mind, Filestage is the perfect choice for marketing agencies, corporate marketing teams, and collaborative content creators. It’s ideal for creative project management.
Pros
- Easy to use
- Time-stamped feedback
- Friendly customer support
- Streamlined process automation
- Very flexible
Cons
- No desktop or mobile app (only usable in the browser)
Key features
- Automation to reduce manual tasks and speed up content reviews
- Due dates keep your projects on track and help you meet deadlines
- In-context comments make for clear feedback that shows up in real time
- Visual annotations bring comments to life and make it clear what needs changing
- To-do lists give your team a clear picture of what needs amending
- Version history helps you keep tabs on previous comments and see what’s changed
- Review steps mean your files get approved by the right people at the right stage of the process
- Project dashboards help you keep track of who you’re still waiting to hear from
- Integrations with Dropbox, Google project management apps, Slack, Microsoft Teams, and more
Pricing
Filestage offers four different pricing plans, including:
- Free plan – $0, with 1 active project, 5 new files per month, 2 reviewer groups, internal and external reviews, unlimited reviewers, all file types, annotation tools, and basic integrations.
- Starter plan – $199/month, with everything in Free plus unlimited active projects, unlimited new files per month, due dates and reminders, compare versions, team-only and copy comments, custom branding, and password-protected links.
- Business plan – $329/month, with everything in Starter plus AI reviewers, automations, 3 reviewer groups, project templates, external partner uploads, comment labels, extra review decisions, workflow integrations, review reports, API & webhooks, and advanced roles.
- Enterprise plan – custom pricing, with everything in Business plus centralized organizational controls, unlimited reviewer groups, advanced reporting and insights, data residency control, audit logs, SSO, and other enterprise-grade security features.
See all your project’s feedback in one place
Bring files, versions, feedback, and approvals together with Filestage.
4. Monday.com – cloud-based project management tool

Monday.com is a cloud-based platform that enables teams to manage their tasks, projects, and workflows in a centralized tool. With its user-friendly interface and automation capabilities, it helps teams increase productivity and streamline their work processes.
Pros
- Customizable templates and an easy-to-use interface for efficient project planning and tracking
- Collaborative tools that allow team members to share ideas, files, and feedback in real time
- Automated workflows and notifications that help streamline tasks and improve productivity
- Advanced reporting features that provide insights and analytics to track progress and make data-driven decisions
Cons
- Costly pricing plans for small teams and startups
- Limited customization options in the mobile app compared to the desktop version
- Limited time-tracking functionality for tracking billable hours and resource allocation
Key features
- Customizable project boards with drag-and-drop functionality for visual task management
- Time-tracking and workload management
- Collaboration tools like comments, mentions, and file sharing for seamless communication
- Automation features, including notifications, reminders, and status updates, to streamline workflows
Pricing
Monday.com offers several pricing plans, including the Basic plan (starting at $8/user per month), Standard plan (starting at $11/user per month), and Pro plan (starting at $17/user per month).
Custom pricing is available for Enterprise plans that include additional support and security features.
5. Basecamp – an affordable project management solution

Basecamp is a collaboration software that provides tools for communication, task management, and file sharing.
It’s designed to help teams stay organized and work together more efficiently by providing a centralized solution for project information and communication. It has a simple and user-friendly interface.
Pros
- User-friendly interface and easy-to-learn features for quick onboarding
- Centralized location for project information, communication, and task management
- Customizable templates and to-do lists for streamlined workflows
- Collaboration features, including chat, message boards, and document sharing, for efficient team communication
Cons
- Limited customization options
- Limited integrations with other apps and software
- No built-in Gantt chart functionality for visualizing project timelines
Key features
- Tools like to-do lists, calendars, and schedules for streamlined workflows
- Collaboration features, including chat, message boards, and document sharing, for efficient team communication
- Automatic check-ins and notifications to keep team members informed and on track
- Time-tracking and reporting features to monitor progress and identify bottlenecks
Pricing
Basecamp now offers three main plans. Basecamp Free is free forever and lets you run one project at a time with up to 20 users and 1 GB of storage. Basecamp Plus costs $15 per user/month (billed monthly) and includes unlimited projects, 500 GB of storage, and 24/7 support. For larger teams, Basecamp Pro Unlimited is $299/month billed annually (or $349/month if you pay monthly) for your whole organization, with unlimited projects, 5 TB of storage, and priority support. Both paid plans include a free trial so you can test the software before committing.
6. Wrike – project management tool with advanced task management features

Wrike is a software that helps teams streamline their workflows and collaborate effectively. It offers features like customizable templates, real-time communication, and time tracking. With its user-friendly interface and automation capabilities, it helps teams increase productivity and efficiency.
Pros
- Advanced features, including dependencies, subtasks, and time tracking, for increased productivity
- Real-time communication and collaboration tools, such as mentions, comments, and file sharing, for streamlined team communication.
- Analytics and reporting features that provide insights into project progress and team performance
Cons
- Limited customization options for the dashboard and reporting features
- Expensive pricing plans compared to other tools
- Limited customer support options for smaller plans
Key features
- Customizable project templates, workflows, and dashboards for efficient project planning and execution
- Real-time communication and collaboration tools, such as mentions, comments, and file sharing, for streamlined team communication
- Analytics and reporting features
- Automation capabilities, including workflow automation, request forms, and email integration, for increased efficiency and productivity
Pricing
Wrike offers five pricing plans. The Free plan costs $0 per user/month and covers essential task management. The Team plan starts at $10 per user/month, and the Business plan starts at $25 per user/month for more customizable workflows. For complex and enterprise workflows, Wrike also offers Pinnacle and Apex plans, with pricing available on request.
7. Teamwork – a powerful task management tool

Teamwork is an advertising agency project management software designed to help teams streamline their workflows and improve productivity. It offers task management, time tracking, real-time communication, and reporting.
With its user-friendly interface and customizable workflows, it helps teams manage projects of any size and complexity.
Pros
- User-friendly interface and customizable workflows
- Advanced features, including dependencies, subtasks, and time tracking
- Real-time communication and collaboration tools, including mentions, comments, and file sharing
- Integrations with other apps, including Microsoft Teams, Salesforce, and Dropbox, for greater flexibility and efficiency
Cons
- Limited customization options for the dashboard and reporting features
- No built-in video conferencing or meeting scheduling features
- Limited mobile app functionality compared to the desktop version
Key features
- Customizable workflows and project templates for efficient project planning and execution
- Advanced features, including dependencies, subtasks, and time tracking, for increased productivity
- Real-time communication and collaboration tools, such as mentions, comments, and file sharing, for streamlined team communication
- Analytics and reporting features
Pricing
Teamwork offers four pricing plans:
- Free – Basic features for up to 5 users
- Deliver – $10.99/user per month
- Grow – $19.99/user per month
- Scale – Talk to sales
The higher-tiered plans offer more advanced features like custom branding and integrations with other apps. A free trial is available for all plans.
8. Jira – a popular project management and issue tracking tool

Jira is a popular issue-tracking software developed by Atlassian. It is widely used by software development teams to plan, track, and release software products.
Pros
- Powerful agile tools, including Scrum and Kanban boards, for effective project planning and execution
- Advanced issue tracking and management capabilities, with custom workflows and fields to fit any project needs
- Seamless integration with development tools, such as GitHub, Bitbucket, and Confluence, for improved agency collaboration and efficiency
- Robust reporting and analytics features
Cons
- Steep learning curve for new users, especially those without experience in agile development methodologies
- It can be overwhelming due to the extensive customization options and features, leading to cluttered interfaces
- Limited mobile app functionality compared to the desktop version
- Expensive pricing plans for larger teams and enterprise-level features
Key features
- Agile tools, including Scrum and Kanban boards, for efficient project planning and execution
- Advanced issue tracking and management capabilities, with customizable workflows and fields to fit any project needs
- Integration with popular development tools, including GitHub, Bitbucket, and Confluence, for seamless collaboration and efficiency
- Reporting and analytics features
Pricing
Jira offers several pricing plans, including:
- Free – for up to 10 users, with basic features and limited support
- Standard – starting at $7.91/user per month, with advanced features including agile reporting and automation
- Premium – starting at $14.54/ user per month, with enterprise-level features like advanced roadmaps and priority support
Jira also offers discounts for annual payments and a free trial for all plans. You can also purchase add-ons and plugins to enhance the functionality of Jira.
9. ClickUp – project management tool offering self-hosted options

ClickUp is an agency project management software that aims to streamline workflow and productivity. It offers a variety of features, including project templates, collaboration tools, and automation, providing teams with a comprehensive solution for project planning and execution.
Pros
- Comprehensive suite of agency project management tools, including time tracking, calendars, and collaboration features
- Customizable workflows and automation capabilities for increased efficiency and productivity
- User-friendly interface and intuitive design, making it easy for teams to navigate and use
- Offers both cloud-based and self-hosted options, allowing teams to choose the best fit for their needs
Cons
- Limited integrations with other project management tools, compared to other agency project management software
- The mobile app is not as robust as the desktop version
- Some users have reported occasional bugs and glitches
Key features
- Customizable workflows and statuses
- Project templates and checklists to help teams streamline and standardize their work
- Collaboration tools, including comments, mentions, and shared calendars
- Automation capabilities, including recurring tasks and custom triggers
Pricing
ClickUp offers various pricing plans for teams of different sizes and needs. Besides their free plan, they offer two paid plans, including the Unlimited plan (for $7/user per month) and the Business plan ( for $12/user per month).
The Enterprise plan offers custom pricing and additional features like single sign-on (SSO) and advanced security. There is also a self-hosted option available for larger teams.
10. Airtable – best for collaborative spreadsheets and databases

Airtable is a project management tool that combines the functionality of a spreadsheet with a database. It allows users to store, organize, and analyze data in a user-friendly and customizable interface.
It allows you to create your own workflows, automate repetitive tasks, and visualize data in various formats. Its versatility and flexibility make it a popular choice for those who need to manage and analyze large amounts of data.
Pros
- Airtable can be used for a wide range of purposes, from project management to inventory tracking
- The platform is intuitive and easy to use, even for non-technical users
- Airtable is highly customizable and can be adapted to fit any team’s specific needs
- It makes it easy for teams to collaborate on projects and share information in real time
Cons
- The platform’s reporting features are limited and can’t meet the needs of advanced users
- The visualization options are limited compared to other data analysis tools
- Importing and exporting data can be complex, and some formats are not supported
Key features
- Customizable fields for storing and organizing data in any format
- Wide variety of pre-made templates to get started quickly
- Share and collaborate on bases with team members in real time
- Integration with collaboration tools like Slack, Google Drive, and Zapier
Pricing
Airtable offers four different pricing packages:
- Free plan with core features for individuals or very small teams getting started
- Team plan for shared workflows, starting at $20 per seat/month billed annually ($24 billed monthly)
- Business plan with advanced features and administration, starting at $45 per seat/month billed annually ($54 billed monthly)
- Enterprise Scale plan with custom pricing for organizations that need flexible apps plus advanced governance and admin controls
11. Smartsheet – a project management tool for streamlining processes

Smartsheet is a cloud-based agency project management software designed to help teams streamline their work processes. It offers features like resource allocation and customizable workflows.
Pros
- Versatile platform for project management, resource allocation, and collaboration
- User-friendly interface with customizable workflows and templates for various project types and industries
- Integrates with a variety of other tools like Google Drive, Microsoft Office, and Salesforce
- Robust reporting and dashboard capabilities to track progress and identify potential issues in real time
Cons
- Limited customization options for certain features, such as the gantt chart view
- Higher pricing plans can be expensive for small to medium-sized businesses
Key features
- Customizable templates and workflows for various project types and industries
- Robust reporting and dashboard capabilities for real-time progress tracking and issue identification
- Integration with a variety of tools, including Google Drive, Microsoft Office, and Salesforce
- Extensive automation options for tasks, reminders, and approval workflows
Pricing
Smartsheet now offers four main pricing plans:
- Advanced Work Management – custom pricing for teams that need full, scalable work management solutions tailored to complex workflows.
- Pro – starts at $9 per member/month, billed yearly, for 1–10 members with unlimited viewers.
- Business – starts at $19 per member/month, billed yearly, for 3+ members, with unlimited guests and viewers.
- Enterprise – custom pricing for organizations with 10+ members that need advanced security, governance, and admin controls.
12. Notion – all-in-one project management tool

Notion is an all-in-one productivity and collaboration tool that allows you to create and organize notes, tasks, wikis, and databases in a single workspace. With its flexible and customizable interface, Notion can be used for personal organization, team project management, or even as a knowledge base.
Pros
- Highly customizable interface allows for tailored solutions
- All-in-one platform for note-taking and database organization
- Real-time collaboration and team communication within the app
- Integration with other tools like Trello, Google Drive, and Slack
Cons
- Limited formatting options for text and tables
- The mobile app has fewer features compared to the desktop version
- Lack of built-in time tracking or project budgeting features
Key features
- Flexible database capabilities for organizing and filtering project information
- Powerful features, including due dates, reminders, and kanban boards
- Collaboration tools like comments, mentions, and shared workspaces
- Embeddable files and media for easy reference and documentation
Pricing
Notion offers four pricing plans. The Free plan costs $0 per member/month and is ideal for individuals organizing personal projects. The Plus plan starts at $10 per member/month, and the Business plan starts at $20 per member/month for growing teams that need more collaboration and admin controls. For larger organizations, there’s an Enterprise plan with custom pricing that adds extra security, control, and compliance features.
13. Worksection – best for creative agency project and workload management

Worksection is a project management and collaboration platform designed to help creative agencies organize client work from planning to delivery. It combines project planning, task management, time tracking, workload management, and team collaboration in one workspace, making it easier to coordinate campaigns, creative production, and client communication without switching between multiple tools.
Pros
- Combines project management, time tracking, workloads, and collaboration in one platform
- Multiple project views, including Kanban boards, Gantt charts, calendars, and dashboards
- Guest access and customizable permissions for working with clients
- Built-in time tracking and workload management for better resource planning
Cons
- The Free plan is limited to five users and two active projects
- Some advanced features, including Gantt charts and automations, require the Business plan or higher
- Teams needing advanced creative proofing may still use dedicated review tools
Key features
- Project and task management with subtasks and checklists
- Kanban boards, Gantt charts, calendars, and project dashboards
- Built-in time tracking and workload management
- Project reports and resource planning
- Comments, mentions, file sharing, and guest access
- Custom roles, permissions, and workflow automations
- API, webhooks, and integrations
- AI-powered summaries
Pricing
Worksection offers four pricing plans:
- Free plan – up to 5 users and 2 projects
- Basic – $3.75 per user/month (billed annually) for unlimited projects, dashboards, reports, and custom roles.
- Business – $7.50 per user/month (billed annually) for Gantt charts, guest access, automations, API access, workload management, and advanced time tracking.
- Premium – $11.25 per user/month (billed annually) for Project Kanban, enhanced security, external file storage, backups, and IP restrictions.
14. Workzone – a collaboration tool for all company sizes

Workzone is a web-based project management and collaboration software designed for teams and organizations of all sizes. Its intuitive interface and comprehensive feature set allow you to track tasks, communicate with team members, and manage projects efficiently.
Pros
- User-friendly interface with customizable dashboards and templates
- Powerful features, including dependencies, Gantt charts, and time tracking
- Robust collaboration tools like commenting, mentions, and file sharing
- Dedicated customer support with personalized training and onboarding
Cons
- Limited integration options with other tools
- No built-in budget tracking or financial management features
- Limited mobile app capabilities compared to the desktop version
- No free plan or trial period for potential users to test out the software
Key features
- Customizable templates and dashboards for efficient project planning
- Gantt charts and critical path analysis for visualizing project timelines and dependencies
- Time tracking, subtasks, and task dependencies
- Collaboration tools like comments, mentions, and file sharing
Pricing
Custom pricing is available. Contact the sales team for the best price.
15. Hive – highly customizable project management tool

Hive is a cloud-based project management and collaboration platform designed to help project managers communicate with team members and track a project’s progress efficiently.
Pros
- Highly customizable platform with different views and templates to fit different workflows
- Collaboration tools like comments, mentions, and chat for seamless team communication
- Time tracking, dependencies, and Gantt charts
- Automated project status updates and reporting for real-time project insights
Cons
- Limited customization options for reporting and analytics
- No built-in budget tracking or financial management features
- The mobile app has fewer features compared to the desktop version
Key features
- Customizable project views and templates to fit different workflows
- Robust features, including time tracking, dependencies, and Gantt charts
- Collaboration tools like comments, mentions, and chat for seamless team communication
- Integration with other tools like Google Drive, Slack, and Zoom for improved productivity
Pricing
Here are the four available pricing plans for Hive:
- Free – $0 forever, best for light project management
- Starter – $5 per user/month, as an entry-level plan for simple project management
- Teams – $12 per user/month, the most popular plan, with no limits and more ways to customize your project management experience
- Enterprise – custom pricing, with extra flexibility, support, and security for larger organizations
16. Zoho Projects – a project management tool for all project sizes

Zoho Projects is a cloud-based project management software that allows project managers to plan, collaborate, and track progress on projects of all sizes.
With its user-friendly interface and robust feature set, Zoho Projects helps you to manage tasks, track time, and automate workflows.
Pros
- User-friendly interface with drag-and-drop features for easy project planning and management
- Customizable project views, including Gantt charts and Kanban boards
- Integration with other Zoho tools and third-party apps for improved productivity
Cons
- Limited customization options for reports and analytics
- The mobile app has fewer features compared to the desktop version
- No built-in budget tracking or financial management features
Key features
- Customizable project views, including Gantt charts, kanban boards, and custom fields
- Collaboration tools like chat, comments, and mentions for seamless team communication
- Integration with other Zoho tools and third-party apps for improved productivity
Pricing
Zoho Projects offers several pricing plans, including:
- Free plan – $0 for up to 5 users and 3 projects, with core project management features
- Premium plan – $4/user per month (billed annually), with unlimited projects and additional features on top of the Free plan
- Enterprise plan – $9/user per month (billed annually), adding more advanced features for larger teams
- Ultimate plan – $14/user per month (billed annually), with the full Enterprise feature set plus increased storage and extras for scaling teams
Zoho also promotes Zoho Projects Plus as a data-driven hybrid project management platform, available with custom pricing.
17. Bitrix24 – project management platform with built-in CRM and sales management tools

Bitrix24 is a cloud-based project management software designed to help businesses manage their projects, tasks, and teams. With a range of communication, collaboration, and automation tools, Bitrix24 allows project managers to work more efficiently and effectively.
Pros
- Comprehensive feature set for project management, including time tracking and collaboration tools
- User-friendly interface with customizable dashboards and project views
- Integration with third-party apps and tools, such as Google Drive and Slack
- Built-in CRM and sales management tools for sales-focused teams
Cons
- Limited customization options for reports and analytics
- Some features are only available in higher-priced plans
- Limited support for Agile methodologies
Key features
- Real-time collaboration tools, including chat, video conferencing, and file sharing
- Time tracking and billing features, including billable hours and client invoicing
- CRM and sales management tools for managing customer interactions and sales pipelines
Pricing
Bitrix24 offers a Free plan plus four paid tiers. The Basic plan costs €49 per organization/month, billed annually, and includes 5 users. The Standard plan is €99 per organization/month with 50 users included, and the Professional plan is €199 per organization/month with 100 users. For larger teams, the Enterprise plan starts at €399 per organization/month billed annually and includes 250 users, with options to scale further as needed.
18. ProWorkflow – a project management tool for simplified collaboration and communication

ProWorkflow is a creative project management software designed to help businesses manage their projects, teams, and resources more efficiently. It provides a range of tools to streamline project workflows, simplify team collaboration, and monitor project progress in real time.
With ProWorkflow, you can easily track project timelines, manage tasks and deadlines, allocate resources, and generate reports.
Pros
- Streamlines project workflows and tasks
- Simplifies team collaboration and communication
- Real-time monitoring and reporting
- Easy resource allocation and scheduling
Cons
- Limited customization options for task templates
- No built-in time tracking for invoicing
- Limited third-party integrations
Key features
- Task and project management tools
- Time and expense tracking capabilities
- Resource allocation and scheduling
- Collaboration and communication tools
Pricing
ProWorkflow offers three pricing plans:
- Professional – $18 per user/month, billed monthly (discount available on the yearly plan)
- Advanced – $27 per user/month, billed monthly, with additional features and a bigger discount on annual billing
- Enterprise – custom pricing, including everything in Advanced, plus extra support and configuration for larger teams
19. Podio – project management solution with customizable workspaces

Podio is a creative project management software that enables you and your team to organize and communicate on projects, tasks, and workflows.
It offers customizable workspaces, social-style messaging, and third-party integrations to help businesses streamline their work processes and boost productivity.
Pros
- Highly customizable workspaces and templates
- Social-style messaging and file sharing
- Third-party integrations with popular apps
Cons
- Limited reporting and analytics capabilities
- No built-in time tracking or invoicing features
- Limited customer support options
Key features
- Customizable workspaces and templates
- Social-style messaging and file sharing
- Third-party integrations with popular apps
Pricing
Podio offers four pricing plans:
- Basic – free for up to 5 employees
- Plus – $11.20/user per month (billed annually)
- Premium – $19.20/user per month (billed annually)
- Enterprise – custom pricing
20. Tempo Portfolio Manager (formerly LiquidPlanner) – predictive scheduling for complex portfolios

Tempo Portfolio Manager (formerly LiquidPlanner) is an all-in-one project and portfolio management platform that uses predictive scheduling to dynamically adapt to change and manage uncertainty across complex portfolios. Instead of static dates, it runs simulations to forecast realistic start and finish dates, so teams always know when work is likely to be done.
It’s built for organizations running multiple projects and programs in parallel, with features for workload balancing, scenario modeling, and deep integrations with tools like Jira and Slack.
Pros
- Dynamic scheduling and resource allocation
- Accurate budget forecasting and time tracking
- Powerful reporting and analytics capabilities
- Automated task prioritization and updates
Cons
- Higher pricing compared to some competitors
- Limited customization options for project templates
- No built-in time tracking or invoicing features
Key features
- Dynamic scheduling and resource allocation
- Accurate budget forecasting and time tracking
- Powerful reporting and analytics capabilities
- Integration with popular apps and tools
Pricing
To get accurate pricing, teams need to:
- Start a free trial from the Portfolio Manager page, or
- Contact Tempo sales / check the Atlassian Marketplace listing for their Jira tier.
Each tier includes the core predictive scheduling engine, workload management, and portfolio views, with higher tiers adding more advanced configuration, integrations, and enterprise support.
21. MeisterTask – project management solution with a customizable and intuitive platform

MeisterTask is a web-based project management software that allows teams to collaborate, plan, and track their work in a customizable and intuitive platform.
It offers features like project automation, custom workflows, and integrations with popular tools, helping your team increase productivity and streamline workflows.
Pros
- Intuitive and user-friendly interface
- Flexible and customizable templates
- Collaboration and communication tools
- Automated workflows and task dependencies
Cons
- Limited reporting and analytics capabilities
- Limited time tracking and invoicing features
- No built-in resource allocation management
Key features
- Customizable templates and automation
- Collaboration and communication tools
- Kanban-style project boards and timelines
Pricing
MeisterTask offers four pricing plans, including:
- Free Plan – free for unlimited users and up to 3 projects.
- Pro Plan – $13.50/user per month (billed annually) for unlimited projects and features
- Business – $24/user per month (billed annually) for additional security and customization options
- Custom – custom pricing for larger organizations with advanced security, customization, and support options.
22. TeamGantt – a solution with intuitive Gantt charts for visual project planning and scheduling

TeamGantt is a cloud-based project management software that helps teams plan, track, and collaborate on projects. It provides intuitive Gantt charts, resource management tools, and time-tracking features to simplify project management.
Pros
- Intuitive Gantt charts for visual project planning and scheduling
- Real-time collaboration and communication tools for team members and stakeholders
- Resource management features for efficient allocation of team members and tasks
- Time-tracking capabilities to monitor performance
Cons
- Limited customization options for Gantt chart views and layouts
- Limited integrations with third-party software
- No built-in budget tracking or expense management features
Key features
- Intuitive Gantt charts with drag-and-drop functionality for project planning and scheduling
- Resource management tools for team member allocation and workload balancing
- Real-time collaboration and file sharing tools, including file sharing and commenting
Pricing
TeamGantt offers three main pricing plans.
The Pro plan costs $49/month per manager and includes up to 20 projects per manager, unlimited tasks, and additional collaborators at $7/month per collaborator.
The Builder Edition costs $79/month (then $159/month after three months) and includes unlimited managers and collaborators with up to 10 active projects.
For larger setups, the Unlimited Everything plan (available on yearly billing) includes unlimited managers, collaborators, and projects, plus extras like RACI, project health, custom boards, and three custom training sessions. Pricing for this tier is available by contacting sales.
23. Paymo – project management solution with integrated time tracking and invoicing capabilities

Paymo is a creative project management software designed for small to medium-sized businesses. It offers a range of features, including project planning and scheduling, time tracking, invoicing, and team collaboration tools.
With Paymo, your team can streamline all project management processes and deliver projects on time and within budget.
Pros
- User-friendly interface and easy to navigate
- Integrated time tracking and invoicing capabilities
- Powerful project management and collaboration features
- Customizable templates and reports
Cons
- Limited integrations with third-party software
- Limited customization options for reports and dashboards
- No built-in budget tracking or expense management features
Key features
- Project planning and scheduling tools with Gantt chart visualization.
- Time tracking with manual and automatic timer options.
- Invoicing and expense management features.
- Team collaboration tools, including task assignments and file sharing.
Pricing
Paymo offers four pricing plans for freelancers and small to medium-sized teams.
The Free plan costs $0/month and includes unlimited time tracking and invoices for one client and up to two projects.
The Solo plan starts at $5.9/month, adding flat-rate and retainer projects, up to three clients, and five projects.
The Plus plan costs $10.9 per user/month and adds features like task spreadsheet view, recurring tasks, bulk time entries, and timesheet reports.
The Pro plan is $16.9 per user/month, unlocking Gantt chart views, task dependencies, portfolio Gantt, employee scheduling and workload, project schedule timelines, and timesheet approvals.
24. ProofHub – cloud based solution for centralizing all project management processes

ProofHub is a cloud-based project management software that helps teams plan, collaborate, and deliver projects efficiently. It offers a range of features, including task management, time tracking, Gantt charts, and team collaboration tools.
ProofHub helps your team streamline workflows and improve productivity by centralizing all project management processes.
Pros
- Intuitive interface with comprehensive features
- Built-in time tracking
- Robust team collaboration tools and communication channels
Cons
- Limited integrations with third-party software
- No built-in budget tracking or expense management features
- Limited customization options for Gantt charts and calendars
Key features
- Collaboration tools for teams
- Gantt chart visualization for project planning and scheduling
- Time tracking with manual and automatic timer options
- Customizable templates, workflows, and reports
Pricing
ProofHub offers two flat-rate pricing plans with no per-user fees:
- Essential plan – $45/month when billed annually ($50/month billed monthly), with up to 40 projects, unlimited users, 15 GB storage, and all core features.
- Ultimate Control plan – $89/month for the first three months when billed annually (then higher after the limited-time offer), or $99/month billed monthly for the first three months. This plan includes unlimited projects, unlimited users, 100 GB storage, and advanced features like custom roles, white labeling, workflows, project manager, IP restrictions, advanced reports, and priority support.
Both plans come with a 14-day free trial and flat pricing, so you don’t pay per seat.
What to look for in your agency project management software
Project management is a broad field requiring you to handle numerous different tasks. Similarly, different project management tools cover different aspects of project management.
That’s why, before buying a new software for your team, make sure it covers all important features.
Here’s what you should look for when choosing a new project management software:
- Automation
- Integrations
- Pricing
- Ease of setup
- Analytics
- Collaboration
Automation
When implementing a new advertising agency project management software to help you optimize your processes, you should look for automation features. Automation can eliminate numerous repetitive tasks and leave more time to focus on other essential aspects of your job.
Here are just some of the things you can speed up by using automation:
- Automate communication so all your teammates stay up to date with the changes made in the project
- Get notifications and alerts for when a due date for a task is approaching
- Automate your workflow by moving tasks across the different statuses
- Automatically add meetings to your calendar and keep your days organized
Integrations
Since different project management software covers various aspects of project management, integrating complementary tools will help you completely optimize the process and deliver great projects with less effort.
As most of the tools from this list integrate with other productivity tools, you should look at your team’s needs and strategically connect them to other tools. Only then will you see the full impact of these tools on your productivity.
Pricing
This one is pretty self-explanatory. At the end of the day, it all comes down to the price of the tool and the budget you have to allocate to it. By carefully examining all available pricing plans for each tool, you’ll more likely find the perfect match for your team.
Ease of setup
We’ve all been in a situation where a certain tool claims that it only takes a few minutes to set up and get going with the platform. Yet, days, if not weeks, go by, and you’re still working with their team on the setup.
To make sure you’re buying a tool with a truly easy setup, you should browse all relevant review pages like Review Software or G2, and find customer feedback on the ease of setup.
Analytics
To completely optimize your process, you need powerful analytics giving you insights into the different aspects of the process. That’s why finding a tool with the right analytics for your team is important.
Here are some of the analytics tools you can look for in a project management system:
- Gantt charts with a visual representation of a project schedule
- Burndown charts showing the amount of work remaining in a project over time
- Time tracking tools to help teams track the time spent on each task and project
- Resource allocation to help teams track the availability and workload of team members
- Reports and dashboards
Collaboration
Project management is a collaborative effort, and your tools should reflect that. If anything, your project management system should have collaborative tools to help you work with colleagues seamlessly.
Collaboration features can increase transparency, make it drastically easier to share files with your colleagues, and keep your whole team up to date with the project’s progress. These features can benefit all teams, especially those working remotely.
Optimize your project management process for free with Filestage
Getting fast approval on all your content is a major part of building a successful process. See it for yourself by trying Filestage for free→
FAQ
How to start using project management software for agencies without losing active client projects?
Start with a small pilot that mirrors your real agency workflows to identify gaps and reduce disruption before migrating all active projects. Most teams using project management software for agencies move client projects by recreating only current milestones, owners, and due dates first, then backfilling history later. Implement a temporary ‘single source of truth’ rule for status updates so project tracking stays consistent. Use customizable templates and workflows to standardize intake from day one, and treat client onboarding as part of the rollout to prevent misalignment across multiple active accounts.
Why do approvals slow down even with project management software for agencies?
Approvals slow down when tasks move forward while feedback is still scattered across email threads, chat messages, and multiple file versions. Project management software can track tasks, deadlines, and progress, but it’s not built for tight feedback loops, clear decision-makers, and structured version control. Online proofing software like Filestage centralizes in-context comments, simplifies collaboration for external reviewers, and creates an auditable trail of client communication across creative projects.
When should project management software for agencies use role-based access for external reviewers?
As soon as you share files outside your marketing team, role-based access becomes part of operational excellence. For larger agencies running cross-team collaboration, set separate roles for internal editors, approvers, and client stakeholders, then restrict access to only the files and actions each person needs.. This reduces accidental edits, keeps client communication clean, and helps complex workflows stay predictable. It also creates a clear audit trail of who reviewed and approved what.
How can project management software for agencies track project profitability accurately?
Profitability tracking works best when time tracking is tied to scoped deliverables, not just hours logged. Map billable time to tasks that reflect actual client work so revenue and effort align. Review key metrics weekly instead of waiting for month end, so you can catch budget overruns early. Use advanced reporting tools to spot scope creep early, and keep a simple rule for how changes affect estimates. When your project management software supports custom reporting, you can break down profitability by client, team member, and service line to see exactly where margins are gained or lost.
What does a clean handoff look like between project management software for agencies and creative approvals?
A clean handoff clearly separates responsibilities: the project management tool remains the source of truth for deadlines and task ownership, while the approval workflow remains the source of truth for feedback and final decisions. In practice, you link each task to one file version, collect client feedback in one place, then sync the final approval status back into project tracking so progress stays visible. Filestage supports this by structuring review steps, maintaining version history, and providing real-time visibility into approval bottlenecks.